|
Questions and Answers : Preferences : Schedule suspend/based on preferences
Message board moderation
Author | Message |
---|---|
Send message Joined: 25 Aug 04 Posts: 1 Credit: 104,255 RAC: 0 |
Hi, Is it possible to use the Windows scheduler to change the option \"Run based on preferences\" / \"Suspend\". The reason is that I only want to schedule boinc to run at night and in the weekends |
![]() ![]() Send message Joined: 5 Aug 04 Posts: 426 Credit: 2,426,069 RAC: 0 |
There are settings in global preferences to do this. However there are a couple of bugs in the implementation currently. If running CCv4.13 or lower it will not suspend if there are any venue preferences set (fixed in higher versions). The CLI will not come out of a suspend once it goes into one (this may only apply to the idle types, I havn't tried the time based ones). |
©2025 cpdn.org