Questions and Answers : Wish list : Can i send part of task?
Message board moderation
Author | Message |
---|---|
Send message Joined: 11 Jan 07 Posts: 2 Credit: 247,191 RAC: 0 |
Im computing one task its over 10% but i havent enought space in hard disk to finish work I afraid What can i do? |
Send message Joined: 13 Jan 06 Posts: 1498 Credit: 15,613,038 RAC: 0 |
On the \'disks\' tab in the Boinc manager: (left-hand chart) * What is disk size? * What is total free space on disk? * How much is being used by Boinc? (right-hand chart) * How much is being used by ClimatePrediction.Net? If it\'s more than 450MB or so it should be possible to trim it down a bit if you post back here with the details. I'm a volunteer and my views are my own. News and Announcements and FAQ |
Send message Joined: 11 Jan 07 Posts: 2 Credit: 247,191 RAC: 0 |
I have hard disk with 75 Gb is use 19 Gb by CPDN at 10% of task The directory TEMP in CPDN is around 18 Gb I have 20 Gb free |
Send message Joined: 13 Jan 06 Posts: 1498 Credit: 15,613,038 RAC: 0 |
It sounds like \'recording\' may have been turned on. This generates a huge amount of rubbish (about 500GB worth I think). Normally the model would only use ~450MB. If you do \'ShowGraphics\', does \'recording\' show in red? If so, press Control-Q to turn it off. You\'ll then need to delete the excess files. These all have a file extension of .CPDN and are in the Temp directory. I'm a volunteer and my views are my own. News and Announcements and FAQ |
©2025 cpdn.org