Message boards : Number crunching : UK Slab Model
Message board moderation
Author | Message |
---|---|
Send message Joined: 26 Aug 04 Posts: 17 Credit: 367,996 RAC: 0 |
The percent status doesnt match with current timestep values... |
Send message Joined: 29 Sep 04 Posts: 2363 Credit: 14,611,758 RAC: 0 |
The slabs have 3 phases. Cpdn news |
Send message Joined: 26 Aug 04 Posts: 17 Credit: 367,996 RAC: 0 |
The slabs have 3 phases. Ok, thx. |
Send message Joined: 26 Aug 04 Posts: 17 Credit: 367,996 RAC: 0 |
I have a big problem, the first WU in phase 1 (model got completely blue) froozen and the time of calculation was running very slow. My second model in phase 3 got also the problem. Any ideas? |
Send message Joined: 5 Sep 04 Posts: 7629 Credit: 24,240,330 RAC: 0 |
|
©2024 cpdn.org